School LeadersContact
Campus Concept Studio · AI campus designer

New · Generative AI · Free

Generate a California school campus concept in 15 seconds.

Pick eight inputs — school level, enrollment target, site context, climate zone, programmatic priorities, design language, sustainability target, bond budget — and Claude streams back a full conceptual campus plan: vision narrative, programmatic space matrix calibrated to CDE loading standards, order-of-magnitude cost range using current California construction benchmarks, phasing recommendation, Prop 2 / OPSC funding map with per-pupil entitlements computed, and a risk-callout list covering DSA review, CEQA, Field Act seismic, prevailing wage, and Title 24 climate-zone specifics.

For board and community planning conversation. Not architectural design. All actual California school construction requires a licensed Architect of Record, DSA approval, and validation by district facilities professionals.

schoolleaders.com/tools/campus-concept-studio Live · Generative AI

AI-native facility planning

Campus Concept Studio

Pick eight planning inputs. Get an AI-generated campus concept — vision, programmatic space matrix, cost range, Prop 2 / OPSC funding map, and risk callouts — in about 15 seconds. For board and community conversation, not architectural design.

Z12

1 = North Coast · 12 = Central Valley · 14 = Desert · 16 = Sierra

Selected: 3

Ready when you are

~15 seconds to stream a full concept · 3 priorities selected

Concept site plan · AI parametric

NSTEMAthleticsOutdoor learningAdminSTEMMPRCTE

Schematic massing diagram only — not architectural design.

For planning conversation only. This tool generates conceptual planning material with AI. It is not architectural design. All California K-12 construction requires a licensed Architect of Record under the California Architects Practice Act, DSA approval under the Field Act (Ed Code §17280+), CEQA review, and compliance with Title 24, AB 2226, and prevailing wage law. Outputs must be validated by licensed professionals before any design, scope, or funding decisions.

Anchored in California statute

Calculations use 2025 SFP per-pupil grant rates, CDE space loading standards (K-6 @ 25, 7-12 @ 27), May 2026 construction benchmarks, and Title 24 climate-zone-specific envelope strategy.

Streaming, no login

Type-by-type output streams from Claude in about 15 seconds. No account required. No data persisted beyond the streaming response.

A conversation starter

This is a planning aid for boards, community forums, and superintendent briefings — the kind of conceptual material that previously cost $25K–$50K and four weeks of an architect's time.

How this tool fits the Facility Master Planning process

School Leaders builds California K-12 Facility Master Plans grounded in real condition data, demographics, and OPSC / Prop 2 funding eligibility. The Campus Concept Studio is the early-conversation layer of that work — a way to test ideas with the board and community before the formal planning engagement begins. Once a direction emerges, our team builds the live, public-facing community webapp + the published five-year Master Plan that the Board adopts.

See examples on our Facility Master Planning service page and the Yosemite Unified School District case study.